09 Aug 30kWp (3 nos.) AC hybrid solar power plant at Partapgarh Completed 30kWp (3 nos.) AC hybrid solar power plant at Partapgarh, Basti and Mirjapur district through Jaiswal battery under UPNEDA (Project Value-0.15 Cr Value). Share:
100 kWp solar Minigrid at gajipur Completed 100 kWp solar Minigrid at gajipur with Power distribution network through Jaiswal battery under UPNEDA (Project Value-0.75 Cr Value).
55KWp solar Minigrid at Sonbhadra Completed 55KWp solar Minigrid at Sonbhadra with Power distribution network through Jaiswal battery under UPNEDA (Project Value-0.45 Cr Value).
10kwp rooftop solar power plant at kanya gurukul mahavidahlya,panchgav bhiwani 10kwp-rooftop-solar-power-plant-at-kanya-gurukul-mahavidahlya panchgav-bhiwani
30kWp (3 nos.) AC hybrid solar power plant at Partapgarh Completed 30kWp (3 nos.) AC hybrid solar power plant at Partapgarh, Basti and Mirjapur district through Jaiswal battery under UPNEDA